
New Launching Project Yoga Mudhra
YOGA
A human sprititual and ascetic discipline, a part of which, including breath control, simple meditation, and the adoption of specific bodily postures, is widely practised for health and relaxation.
MUDHRA
A mudra a symbolic, ritualistic gesture used in yoga, Buddhism and Hinduism. The word is Sanskrit meaning "gesture", "mark", or "seal." Mudras are most commonly known as hand positions in yoga and meditation, which are believed to affect the flow of energy in the body and unblock chakras.
There are numerous thpes of mudras. Each type is thought to have a specific effect on the body and mind by clearing the psychic centers and energy channels. Although hand mudras are the most common in yoga, there are also head, postural, lock, and perineal mudras.


East Facing Plan

North Facing Plan

Bird Eye View

Full Floor Villa

Layout Key Plan

North Facing Villa

East Facing Villa

East Facing

North Facing
Our Site Address
-
484/1 Saravanampatty to Thudiyalur Road, Near SNS Arts and Science College, Chinnavedampatty Village,
Coimbatore - 641049.
- +91 999 44 222 22
- info@jayabharath.com